Rink Expansion for the San Jose Sharks and a New Tech CU Arena
PROJECTS / INSTITUTIONAL / SHARKS ICE EXPANSION
On their existing 19.3 acre site, the San Jose Sharks wanted to add two new rinks to their existing four-rink ice facility. They also sought to designate one of the new rinks as a future medical facility and a 4,200 seat arena for their AHL affiliate, San Jose Barracuda.
KEY SERVICES
TOPOGRAPHIC AND PROPERTY LINE SURVEY
AS-BUILT SURVEY
ENTITLEMENT PLANNING PROCESSING
PRELIMINARY SITE ENGINEERING DESIGN
PARKING LOT GRADING & DRAINAGE DESIGN
PUBLIC UTILITIES & PRIVATE SITE UTILITY SERVICES DESIGN
HYDROLOGY AND HYDRAULIC CALCULATIONS
C.3 STORMWATER TREATMENT DESIGN
ADA ACCESSIBILITY DESIGN
SITE ACCESS DRIVEWAY IMPROVEMENTS
CONSTRUCTION SUPPORT AND STAKING
2
official NHL rinks completed
RJA assisted the client with feedback on grading, stormwater treatment, and utilities while identifying issues and providing solutions to those challenges. RJA also guided the client through the entitlement and construction document process with the city by preparing planning level documents and civil site improvement and grading plans for city’s review and approval. Additionally, RJA provided construction staking and support during construction.
PROJECT RESULTS
Construction of the two new rinks completed in 2022. The first San Jose Barracuda game was played at the new arena in October that year.